Night Time Closures South of 36A Avenue on 66 Street

AREA 6 Night Time Closure AREA 6 66 Street South of 36A Avenue June 23, 2020 – On or about July 6, 2020 EPCOR will be working overnight south of 36A Avenue on 66 Street to expose underground utilities and for directional drilling.  This work will occur overnight between the hours of 9:00 p.m. and 6:00 a.m and is expected to last two nights. There will be hydrovac noise and flashing lights while this work is completed. Flaggers will be on site to assist motorists. To accommodate this work, the public will be impacted in the following areas:  The inside northbound [...]

Night Time Closures South of 36A Avenue on 66 Street2020-06-24T20:23:12+00:00

Detection Loop Installation on 83 Street

AREA 4 Overnight Lane Closures AREA 4 83 Street Between Argyll Road and 76 Avenue Starting on or about June 29, 2020 crews will be installing Detection Loops on 83 Street from Argyll Road to 76 Avenue. Detection loops are cut into the road and connected to the traffic cabinet. When a vehicle drives over the loop, or stops on the loop, it will activate the traffic changes. This overnight work will occur from 9:00 p.m. to 6:00 a.m. and is expected to last five nights. To accommodate this work, the northbound lane will be closed to traffic between Argyll Road [...]

Detection Loop Installation on 83 Street2020-06-23T22:20:35+00:00

Overnight Concrete Work – Argyll Road to 76 Avenue

AREA 4/5 Overnight Northbound Lane Closure View this email in your browser 83 Street Between Argyll Road & 76 Avenue Starting on or about June 25, 2020 crews will be continuing concrete work for track slab placements on 83 Street from Argyll Road to 76 Avenue. This overnight work will occur two or three nights each week, from 9:00 p.m. to 6:00 a.m., and is expected to last four weeks. To accommodate this work, the northbound lane will be closed and traffic between Argyll Road and 76 Avenue, however, Flaggers will be on hand to assist motorists. There will be noise [...]

Overnight Concrete Work – Argyll Road to 76 Avenue2020-06-20T16:38:05+00:00

LRT Elevator Closure

AREA 1 Pedway Access Disruption View this email in your browser 99 Street and 102 Avenue Starting on or around June 8, 2020, TransEd crews will be working on 102 Avenue just south of the Winspear. The ramp and stairs leading into the Winspear and current LRT elevator on the north side of 102 Avenue, just east of 99 Street, will be closed for approximately two weeks. This work is to remove and replace the existing sidewalk. There will be noise associated with this work as crews will have to saw cut and break through the existing concrete. As much as [...]

LRT Elevator Closure2020-06-03T13:29:52+00:00

Concrete Trackslab Pour on 83 Street

AREA 4 Traffic Disruption AREA 4 83 Street From Argyll Road to 76 Avenue Starting on or about June 8, 2020 crews will be pouring concrete for track slab placements on 83 Street from Argyll Road to 76 Avenue. This work will take place overnight, from 9:00 p.m. to 6:00 a.m. and is expected to last for three nights. To accommodate this work, the northbound lane will be closed and traffic between Argyll Road and 76 Avenue. There will be noise associated with this work such as concrete pump trucks backing up, as well as concrete pumping and small machinery moving.  [...]

Concrete Trackslab Pour on 83 Street2020-06-03T13:26:57+00:00

66 Street Overnight Work – Signal Arm Installations

AREA 6 Overnight Traffic Disruptions AREA 6 66 Street Between Whitemud Drive and 41 Avenue Starting on or about June 11, 2020, EPCOR will begin installing the signal poles and davit arms (the arms from which the signal lights will hang) 66 Street from Whitemud Drive to 41 Avenue.  This work will occur overnight from 9:00 p.m. to 6:00 a.m. for two nights.  Flaggers will be on site to assist traffic. To accommodate this work, the public will be impacted in the following areas: Overnight work on 66 Street from Whitemud Drive to 41 Avenue. On June 11, the southbound curb [...]

66 Street Overnight Work – Signal Arm Installations2020-05-31T16:16:20+00:00

The Fleeced and the Furious

Taxes have gone up. Again. If you ask any member of Council, they will tell you there are places where the City is not running as efficiently as it could be. When you ask where, they seldom seem to have a specific answer. When they identify an area that needs work, the solution is almost always more money. Their measurement for success is how much money they can spend on the problem, as opposed to how much of the problem they solved. If one day, we opened the fridge door, and the light was out, there is an unwritten checklist of [...]

The Fleeced and the Furious2020-05-29T15:47:37+00:00

Payday Spending

A successful City is based on the progress of its management, responsible spending, and the constituents who make it a home. While we are living through a global pandemic, we are being asked to stay home in efforts to stay safe and healthy and not overwhelm the healthcare system. During this time where mental health might be especially fragile, going out for a walk to get some fresh air is encouraged. However, you must remain 6 feet away from the next person to practice social distancing. As Councillors, we are getting mixed reviews. Some people say it’s just too hard to [...]

Payday Spending2020-05-14T12:16:38+00:00

Overnight Signal Installations

AREA 5 & 3 Overnight Signal Installations 75 Street and 51 Avenue Starting on or about May 14, 2020, EPCOR will begin installing the signal poles and davit arms (the arms from which the signal lights will hang) on 51 Avenue and 75 Street.  This work will occur overnight from 9:00 p.m. to 6:00 a.m. for one night.  There will be alternating lane closures in this intersection as the work is completed.  Flaggers will be on site to assist traffic. To accommodate this work, the public will be impacted in the following areas: Overnight work on 51 Avenue and 75 Street. [...]

Overnight Signal Installations2020-05-04T19:31:52+00:00

Night Time Closures at 34 Avenue and 66 Street

AREA 3 & 6 Overnight Work Night Time Closures at 34 Avenue and 66 Street On or about May 8 & 9, 2020 EPCOR will be working overnight at the intersection of 34 Avenue and 66 Street to expose underground utilities and for directional drilling.  This work is expected to last for two nights and occur overnight between the hours of 9:00 p.m. and 6:00 a.m. There will be hydrovac noise and flashing lights while this work is completed. To accommodate this work, the public will be impacted in the following areas:  One southbond lane in the intersection of 34 Avenue [...]